Company Info      Products      Install Instructions      Request Info    

Running Boards  Dodge Ram   2002-current   
Installation Package
Running Board
2
Installation Instructions
1
Bracket
8
Bolt Pack
1
Light Wiring Kit 1

Necessary Tools
Safety Glasses  
Ratchet wrench with ½" socket  
Combination wrench  
Variable speed drill w/ 3/8" hex head drive

STEP ONE: Determine proper bracket placement
Fig A
1) Measuring from front to back the brackets will be placed on or around these measurements, 7", 30", 50", and 74".
2) Loosely bolt brackets to bottom of board and hold board to bottom of truck and tec screw bracket to rocker panel through the slot of bracket.
3)Do this with all brackets putting them in their proper places.

STEP TWO: Attaching twist strap to bracket and pinch weld
1) Attach twist strap to bracket using 5/16" bolt and flange nuts
2) Hand tighten the board to the brackets using 5/16" flange nuts
3) Slide board in or out to desired location
4) Tighten down flange nuts under running board

STEP THREE: Installing twist strap to pinch weld
1) Push board tight against vehicle and mark hole on pinch weld
were you need to drill. (Fig. C)
2) Bolt strap to the pinch weld using a 5/16" bolt and flange nut. Put one more tec screw into the top of the bracket using any three of the holes in the top of the bracket.

3) Check that all brackets are tight before stepping on boards.

          

    
Fig A

Fig B

Fig C
Fig D



  Copyright © 2001 SharpBoards LLC All Rights Reserved
840 NW 24th Court Ocala, FL 34475 • Phone: 352-840-9696 Toll Free: 877-864-0644 • Fax: 352-840-9994
Email: sales@sharpboards.com